Dragline Crane Overhaul, Bowen Basin

NQCranes removes the crane from the dragline and transports to our Mackay workshop. An assessment is given of the hoist and crane prior to stripping. We then remove the hoist off beam, rope guide and rope and conduct a complete run test of equipment and parts. NQCranes overhauls or replaces all necessary parts, fits the crane with an NQCranes electronic latch system and repaints the crane including updated signage. After in-house load testing and calibration, NQCranes transports the crane back to site and reinstalls into the dragline.

Overhauls are organised months in advance with our mining customers, to suit upcoming scheduled shutdown work. This reduces crane downtime and ensures project reliability during major dragline shutdowns between NQCranes and our customer.

Read More
Coffee Hops
H-E Parts International Pty Ltd, Mackay

H-E Parts International, Mackay required two underslung cranes and runway system to suit their existing building. NQCranes designed, engineered and fabricated the cranes and runway system including the design and manufacture of electrical switchboards with smooth VSD Control. NQCranes erected and installed the cranes and runway and tuned the VSD Control as requested by the customer.

Read More
Coffee Hops
Stanwell Barron Gorge, Cairns

Stanwell Corporation required a complete refurbishment on five monorail beams (3x 250kg & 2x 2T) within the Barron Gorge Hydroelectric power station, Cairns. NQCranes removed the existing monorails from site and completed the structural modifications required for refurbishment. We also completed a visual inspection, NDT, blast and paint. The main 1.6T Monorail was replaced with a new monorail with an increased capacity of 2T. The location of this monorail was changed to assist with removal of key components for future overhauls. All monorails were reinstalled, load test and commissioned to the Australian Standards.

Read More
Coffee Hops
Stresscrete Precast & Prestressed Concrete, Rockhampton

This project was one of NQCranes’ largest manufacturing projects to date. Our customer required two 50T x 32m Span Full Portal Dual Girder Cranes. The customer supplied us with existing crab units which our team assessed for damages and refurbished. NQCranes then designed, engineered, fabricated, assembled and full factory tested the 50T cranes. stainless-steel long travel panels and interconnecting cables were supplied. NQCranes then organized transport of the cranes which included a police escort from Mackay to Rockhampton.

Read More
Coffee Hops
Austchrome Pty Ltd, Mackay

Ray Dorrstein Group for Austrchome Pty Ltd required new cranes at their premises in Commercial Avenue, Paget. NQCranes completed an engineering assessment to confirm the structural integrity of the existing building and runway, removing the existing overhead cranes located in the building. We then supplied the customer with three 10T x 23m and one 5T x 23m Span Overhead Travelling Cranes.

Read More