Stanwell Barron Gorge, Cairns

Stanwell Corporation required a complete refurbishment on five monorail beams (3x 250kg & 2x 2T) within the Barron Gorge Hydroelectric power station, Cairns. NQCranes removed the existing monorails from site and completed the structural modifications required for refurbishment. We also completed a visual inspection, NDT, blast and paint. The main 1.6T Monorail was replaced with a new monorail with an increased capacity of 2T. The location of this monorail was changed to assist with removal of key components for future overhauls. All monorails were reinstalled, load test and commissioned to the Australian Standards.

 
 